12
May
Djibouti
Category:

Passengers traveling to and from the Republic of Djibouti by any means (aircraft, boats, trains, collective transport vehicles) must
be tested for COVID-19 upon arrival at air, land or seaports of entry and will cost for test $30.00.

12
May
Oman

Upon arrival at Muscat Airport crew members have to conduct PCR test and wait in a hotel for one day to obtain results, if results negative the crew member can join the vessel, otherwise a 14-days quarantine in a hotel is required until results are negative.

12
May
Turkish Straits: Waiting Times

The Turkish Straits are among the most important maritime trade corridors in the world. Both the Bosporus and Dardanelles Straits comprise the Turkish Straits which together enable tens of thousands of vessels to pass through them yearly.

12
May
Peru

All vessels must anchor first in order to be inspected by sanitary authorities and receive free platique. International flights from Europe and Brazil have been suspended until now to reduce risk of infection due to the new variant of Coronavirus.

11
May
Panama Canal: Waiting Times

The waiting times displayed in the following report correspond to the maximum waiting time currently experienced by the vessels that are already in the queue, hence it should only be considered as a general reference.

10
May
Turkey

Republic of Turkey has decided to suspend flights to United Kingdom, Denmark and South Africa temporarily. Turkey will ask PCR negative test results from all the passengers coming to Turkey as from 28.12.2020. Tests must be valid for 72 hours.

5
May
Ivory Coast

As of the 6th of February, there are 29,295 confirmed COVID-19 cases in Ivory Coast with 160 deaths. A Health State of Emergency was re-issued on 21st January through 28th February calling for stronger enforcement of protective health measures.

3
May
Chile

The nationwide nighttime curfew is maintained from 21:00 to 5:00 Chilean Local Time. The Ministry of Health has announced updates regarding the Step-by-Step plan, which comes into effect on the 3rd of April, at 05:00 hrs LT.